The class at IIT was not meeting my expectations, so I decided to quit going. This means I can get cracking on the room again. I think I’m just about done with the drywall taping. I just need to wipe down the coat I put on yesterday and I’ll be ready to prime it. I also started working on the floor. I cut out the bad pieces and cut some new plywood to fill. I may have to put something thin beneath the plywood to make sure it’s level with the rest of the floor. But I think it’ll be ok. Another trip to Home Depot to buy the ductwork and I should be good to go.