Plaster Is Gone
So there is no plaster left in the bedroom. (Finally!) I even put up some photos to show the progress. They are here.
The photos are from February and March. In the earlier photos, notice that there are supports for built-in shelves. I decided to take those down and build different types of shelves that should be easier to put up.
Still to do: Run conduit to the bedroom for a light; move the entrance to the closet to the side closest to the window; take down old electrical wires; run another wire to ceiling fan (so can have separate switches for the light and fan); build wall for insulation in closet; finish insulating and then DRYWALL!